FAIL (the browser should render some flash content, not this).
 
 
     
     
Back to Commercial Projects
  The design brief was to completely refurbish the established but dated Tavern incorporating new lounge areas, bar, toilets, commercial kitchen, dining area and facade.

The project although complex in nature was stripped out, constructed and opened within an amazing 6 weeks period thus ensuring any loss of revenue to the proprietor was kept to an absolute minimum.
 
Buildability Constructions Pty Ltd © 2007. All Rights Reserved
PO Box 163, Pyrmont NSW 2009 | T: (02) 9566 1122 | F:(02) 9566 1155